16020 IY Bozen 11.33 46.47 239 Orog : 899 AGL : Dienstag, 10.Maerz 2026 12 UTC ZAMG/ECMWF (0.125 Grad) Tage 4-6 ======================================================================================= Termin | SA,14.Mar 2026 | SO,15.Mar 2026 | MO,16.Mar 2026 | Zeit UT | 00 06 12 18 | 00 06 12 18 | 00 06 12 18 | ========|=========================|=========================|=========================| N | 7 7 7 8 | 7 8 8 6 | 7 4 8 1 | Nh | 0 3 6 8 | 3 4 8 1 | 3 3 8 1 | Nm | 2 3 3 5 | 6 6 4 5 | 6 1 6 0 | Nl | 7 6 5 2 | 5 7 4 4 | 2 1 0 0 | N-CU | 0 0 2 2 | 1 0 2 1 | 1 0 7 6 | --------|-------------------------|-------------------------|-------------------------| SHW-IX | 5.8 7.6 4.9 3.7 | 4.2 3.9 2.4 5.9 | 7.2 5.8 1.6 3.1 | AUSL.T | 10 9 14 15 | 11 9 14 11 | 11 10 18 14 | WX -CUF | NIL NIL NIL NIL | NIL NIL RASH NIL | NIL NIL RASH NIL | --------|-------------------------|-------------------------|-------------------------| RR | 0.1 0.1 0.1 0.0 | 0.1 0.1 0.2 2.0 | 1.0 0.0 0.0 0.1 | RR-str | --- --- --- --- | --- --- 0.1 0.1 | 0.1 0.0 --- --- | CONV | 0.1 0.1 0.1 0.0 | 0.1 0.1 0.1 1.9 | 0.9 --- 0.0 0.1 | SN | --- --- --- --- | --- --- --- 0.0 | --- --- --- --- | --------|-------------------------|-------------------------|-------------------------| SN--RA | 1400 1200 1600 1700 | 1500 1300 1600 1600 | 1400 1400 1800 1500 | --------|-------------------------|-------------------------|-------------------------| QAO 300 | 31004 25007 23010 22014 | 23020 31011 36018 36018 | 31011 25025 25025 27010 | QAO 500 | 26007 25006 23008 25009 | 24009 25011 26013 32009 | 31012 31016 26014 24011 | QAO 700 | 23005 24007 23006 23004 | 23006 26005 24005 27005 | 29005 32006 28007 33010 | QAO 850 | 18003 18002 21002 21002 | 18001 19001 20002 21001 | 04001 03002 28001 02007 | QAO 925 | 09001 09001 23001 24000 | 08001 08001 22001 33000 | 08001 07001 26001 03002 | QAN | 09001 09000 23001 25000 | 08001 06000 22001 32000 | 10000 08001 25001 03002 | QANmax | 5 4 6 6 | 3 3 6 7 | 3 3 7 9 | --------|-------------------------|-------------------------|-------------------------| T 300 | -49 -50 -50 -50 | -50 -49 -46 -46 | -47 -48 -52 -51 | T 500 | -22 -22 -23 -23 | -24 -25 -26 -22 | -22 -25 -27 -28 | --------|-------------------------|-------------------------|-------------------------| T 3000m | -6 -7 -8 -7 | -8 -8 -7 -7 | -8 -8 -7 -10 | T 2000m | -2 -3 -2 -1 | -2 -2 -1 -1 | -2 -2 0 -2 | T 1500m | 2 0 3 3 | 2 1 3 3 | 1 1 5 2 | T 1000m | 5 3 7 8 | 6 4 8 6 | 5 4 10 6 | T 800m | 7 5 9 9 | 7 5 9 7 | 6 5 11 8 | T 700m | 7 5 9 10 | 7 6 10 8 | 7 6 12 8 | T 500m | 9 7 11 11 | 9 7 11 9 | 8 7 13 10 | --------|-------------------------|-------------------------|-------------------------| T 2m | 2 1 9 7 | 3 3 10 6 | 3 1 12 6 | Tk 2m | | | | T GND | 7 6 14 12 | 8 7 14 10 | 7 6 17 10 | Max-ADI | 15 14 16 17 | 15 14 16 16 | 15 14 18 15 | Min Max | 5 15 | 6 15 | 6 17 | FROST | 1700 1600 1800 1900 | 1800 1700 1800 1900 | 1700 1700 2000 1800 | --------|-------------------------|-------------------------|-------------------------| W500 cm | 1.1 3.5 -0.6 0.7 | -1.5 1.9 3.5 -0.1 | -2.1 -4.3 13.5 -0.5 | W700 -- | -0.4 0.6 1.8 -1.2 | -0.6 -1.2 -1.1 8.0 | -0.1 0.4 -3.4 -1.6 | W850 s | 3.0 1.6 0.6 3.7 | 3.6 1.9 2.4 -1.6 | -0.5 -1.3 -2.2 -5.5 | --------|-------------------------|-------------------------|-------------------------| H 700 | 2995 2972 2979 2987 | 2994 2993 3000 2995 | 2991 2983 2985 2977 | H 1000 | 123 114 98 99 | 122 130 117 118 | 122 118 84 108 | --------|-------------------------|-------------------------|-------------------------| RF 300 | 74 99 100 100 | 64 15 92 96 | 100 65 18 20 | RF 400 | 47 48 56 87 | 98 100 29 70 | 99 85 100 51 | RF 500 | 30 57 57 72 | 86 100 88 49 | 96 20 75 41 | RF 700 | 51 67 82 88 | 93 86 88 90 | 62 71 50 50 | RF 850 | 98 88 74 75 | 90 94 74 78 | 81 72 47 48 | RF 925 | 84 83 55 59 | 79 82 55 81 | 79 82 35 48 | =======================================================================================